Next Week +

Next week we should be getting inspections from electrical and plumbing. After that we will get rough framing inspections. The HVAC should be all roughed in and ready to go.  

Then the lights are in and available.
All plumbing fixtures are on-site.

Vanity and Hutch will be delivered at the same time to save costs.  This will be after tile floors installed and grouted.  