Notes - 4/24/13

Paint - Painting to start Monday 4/29.  LL to have complete paint list by Friday 4/26.

Furniture - Furniture will be removed from premises 4/25

Electrical

  • Will change master switch locations and alarm locations to opposite sides of the door.
  • Will add one more outlet behind bed.  The left one is as far over as they can make it due to the pocket door addition.  Will see if there is another solution.

Addition - Check on this yesterday.  It is still in legal.  Once out of legal it will be 20 days before we can apply for a permit.

Design
  • Submitted designs for additional cabinets over range.  Waiting on feedback.
  • Submitted design for Eliza's desk. Continuing discussion.
  • Dining Room Hutch first pass has been submitted.  Waiting for feedback.
Windows - All replacement windows have been installed.  Scheduling storm window installation  now.

Rear Door

  • Will be adjusted in its location more toward the outside of face of the brick.
  • LL to chose hardware.